Pencil on wall, cables, suspension devices, 6 bulbs with china base,
programmed light cycle (the bulbs are lightened up 108 minutes per day,
each day at a different hour), electronic devices (6-channel Dimmer-box, Lan-box),
red adhesive tape on wall
Dimensions vary with installaton.
Ed. 3 (+1A.C.)
Installation instructions sheet; Signed and date Certificate
Installation view: Fondation d’Entreprise Ricard, Paris, (March 2012)